July 2026
The CdWO4 crystal has been successfully installed, and data taking has begun!
May 2026
The shielding is now in place and ready at Gran Sasso National Laboratories, while we wait for the detectors to be installed!
Pictures of the assembled PTFE box

A drawing of the PTFE box containing the shield and the detector





